Balance Beam – S Curve (Mini)

AED 2,415 (ex. VAT)

Size L 200 cm x H 40cm

Product Features
Quality Guaranteed
Fast Delivery
Easy Returns
Secure Payment
Product Information
Availability: In Stock
SKU: SOFPLA69
Share:

Description

Moon kids balance beam encourages movement, balance and muscle development.

Product Details:

  • Size: L 200 cm x H 40cm
  • Age Group: 6 Months+
  • Product Color: Multi
  • Material: Foam & Vinyl Fabric
  • Finish: Vinyl Fabric

Attention:

  • Safety Features – All elements are soft & safe.
  • What material is it made from – Foam & Vinyl Fabric.
  • Where can this product be used? – This product is for indoor use only.
  • Assembly – Do not worry about assembly, we will do it.
  • Maintenance – Wipe down with a damp cloth to remove any marks or dust. Do not use any harsh cleaning chemicals.
Size

L 200 cm x H 40cm

Age

6 Months+

Color

Multi

Material

Foam, Vinyl Fabric

Finish

Vinyl Fabric